Uzbekistan Railways Delegation Visits NPO SAUT: May 2026
On May 20–26, 2026, a JSC Uzbekistan Railways delegation in Astana and Yekaterinburg studied the locomotive diagnostics and maintenance experience of ALSTOM and NPO SAUT LLC: БЛОК-М, САУТ-К, САУТ-ЦМ/НСП, automatic train operation and ТУ-152.
On May 20–26, 2026, a delegation of JSC Uzbekistan Railways visited Astana (Kazakhstan) and Yekaterinburg (Russia). The visit focused on modernizing locomotive maintenance and repair. It was a practical continuation of the agreements reached at the Fifth International Conference at TSTU in April 2026. As the official dealer and representative of NPO SAUT in Uzbekistan, RailTech LLC took part in the events.
What the delegation studied
The delegation studied the experience of ALSTOM and NPO SAUT LLC in:
- modern diagnostics;
- digital control platforms;
- technical condition monitoring of locomotives;
- automation of service and repair processes;
- energy efficiency;
- engineering and operating technologies.
At NPO SAUT: locomotive and station systems
In Yekaterinburg, the delegation was shown NPO SAUT's developments:
| System | What was shown |
|---|---|
| БЛОК-М | Safe integrated locomotive complex: remote diagnostics and telemetry from any traction unit |
| САУТ-К | Locomotive safety system |
| САУТ-ЦМ/НСП | Station equipment: design, operating principles and integration into the existing infrastructure of JSC Uzbekistan Railways |
| Automatic train operation | Technology for automatic train driving |
| ТУ-152 electronic log | Designed to replace paper logs |
According to NPO SAUT, automatic train operation reduces the driver's workload and improves energy efficiency, and the ТУ-152 electronic log is designed to fully replace paper logs.
Visit to Ural Locomotives
The program included a visit to the Ural Locomotives plant in Verkhnyaya Pyshma, which produces the 2ЭС10, 2ЭС7 and 2ЭС11 electric locomotives, the Lastochka and Finist electric trains and the ЭВС360 Belyy Krechet high-speed train.
Continuing the April agreements
The visit continued the work that started in April 2026 at the TSTU conference and the opening of the NPO SAUT training classroom. At that time the parties discussed localization of equipment and components of train safety systems in Uzbekistan, and TSTU and NPO SAUT signed a memorandum with a 2026–2030 roadmap. More details are in the article on the April events.
As the official dealer and representative, RailTech represents NPO SAUT's interests in Uzbekistan. See the representation service and the NPO SAUT representation project pages.
Sources
- NPO SAUT LLC: Visit of the JSC Uzbekistan Railways delegation
- JSC "Temiryo'linfratuzilma" news: railwayinfra.uz